Appreciate if someone can assist me with the below question as I am really stuck

Part A


Little Red Hood Inc. management has estimated the factory overhead cost as $1090 variable cost and $1430 fixed cost to make 100 units using 500 machine hours.


Required:

1. Using the above information, derive the cost equation in the form of Y = a + bx.

2. Predict the cost with 550 machine hours.

3. Compare the above method of cost estimation with engineering approach, with respect to the costs and benefits of the two approaches.


Part B

You are provided with the cost data from twelve observations of electricity, a semi-variable cost.

Refer the data via the link below
https://ibb.co/eF9R7a

Required:

  1. Use scatter graph to estimate the cost equation (Y = a + bx).
  2. Estimate the cost equation using high low method
  3. Estimate the cost equation using regression analysis.
  4. Predict the cost of electricity (using all the three methods 1-3) for the month in which 38000 machine hours are used.






 